Anyone know where this part might go?
How do you convert back to 3/8 sucker rod from the 2x2? End of 2x2 shown.
Now on #26 "feathering rod" Is there a part on the end of the rod?
My rod is just bent and needs to be a close 90 degrees.
Sorry, I can never figure out the order of the pictures posted.
Might be for my project, 1903 RA
Might be for my project, 1903 RA
You do not have the required permissions to view the files attached to this post.
Re: Might be for my project, 1903 RA
#135 is the pump rod. It attaches to the pitman arm with another piece I cant remember. The pump rod has a #138 on the bottom. This attaches to the 2x2. What you have in your picture is the bottom of the 2x2 where it converts to go into the well. Yours is a home made piece. Basically you need another #138 to attach to the bottom of the 2x2 and then to the sucker rod to go into the well.
Re: Might be for my project, 1903 RA
The #6 pitman attaches to the #8 and something else attaches to the sucker rod #135.