Shattuck 2019 - productive work week?
- PaulV
- Site Admin
- Posts: 998
- Joined: Wed Dec 12, 2018 10:52 pm
- Location: Collinsville, Oklahoma
- Contact:
Shattuck 2019 - productive work week?
Who was able to attend the work week? How did it go? Share some pics if you have them.
PaulV
Re: Shattuck 2019 - productive work week?
Man, things went in the toilet here. Was going to go, but lost the engine on the mill truck. So, of course, first things first. This is the first year someone from Ames didn't make it.
Call Dan Benjamin for parts. P M me for the phone number.
- JeffreyMead1701
- Posts: 19
- Joined: Tue Sep 24, 2019 2:51 am
- Location: Iowa City, Iowa, USA
Re: Shattuck 2019 - productive work week?
Naw. Just time consuming, and of course, happened at a lousy time. Could be worse. Could have a wiring issue. lol
You do not have the required permissions to view the files attached to this post.
Call Dan Benjamin for parts. P M me for the phone number.
Re: Shattuck 2019 - productive work week?
Ruby and I were at work week. We worked on the 18ft RR Eclipse after the wind tore it apart in March of this year.
We rebuild the tower. Replaced one tower leg 6X6 X12ft timber. Than rebuild the telescoping tower 4 - 6 X 6 X 16ft timbers not a easy job. With 4 new bottom cross timbers to hold the telescoping tower.
Doug and crew took the head down and took the wheel apart. New rims with some new sails. Repaint the wheel and tails also re-stenciled the tail and put the wheel all back together.We rebuild the tower. Replaced one tower leg 6X6 X12ft timber. Than rebuild the telescoping tower 4 - 6 X 6 X 16ft timbers not a easy job. With 4 new bottom cross timbers to hold the telescoping tower.
You do not have the required permissions to view the files attached to this post.
Re: Shattuck 2019 - productive work week?
The Hummer "L" wheel was repainted and put back on the mill.
Years ago Shattuck got a Dempster Boss that was restored. We got it put up in the Red barn. It has a 6ft wood tower and platform build for it.
Years ago Shattuck got a Dempster Boss that was restored. We got it put up in the Red barn. It has a 6ft wood tower and platform build for it.
- Star Zephyr
- Posts: 26
- Joined: Fri Jan 04, 2019 10:59 am
- Location: Lubbock, TX
Re: Shattuck 2019 - productive work week?
Here's a few pictures from Shattuck work week 2019
You do not have the required permissions to view the files attached to this post.
- Star Zephyr
- Posts: 26
- Joined: Fri Jan 04, 2019 10:59 am
- Location: Lubbock, TX
Re: Shattuck 2019 - productive work week?
and here's a few more
You do not have the required permissions to view the files attached to this post.
Re: Shattuck 2019 - productive work week?
Cool Thanks!
Re: Shattuck 2019 - productive work week?
Thanks Terry. As always, good job. Sorry we missed the fun.
Call Dan Benjamin for parts. P M me for the phone number.