Page 2 of 7

Re: Different Windmill Raising/ Tear Down Techniques

Posted: Thu Jan 24, 2019 9:32 am
by JBarker
Ron,

Thanks for the information. This will help me make my decision.

Re: Different Windmill Raising/ Tear Down Techniques

Posted: Thu Jan 24, 2019 9:58 am
by Wayne
Murphy's Law!

Re: Different Windmill Raising/ Tear Down Techniques

Posted: Fri Jan 25, 2019 8:07 am
by Joshschneids
grezmonki wrote: Wed Jan 23, 2019 5:29 am A pump hoist does it for me. Here Im installing just the mill, but if I do a complete, I usually raise the tower first ,get it set and secure then install the mill onto the tower.DSCN1529.JPG
Very Cool Grezmonki, I have my mill i have to put up at some point so i am looking for ways to do it. A small crane seems to be about the best way i can find. I just needed the keyword "Pump Hoist". In re doing my mill i have come across all these mills that i would love to have and am looking to find something simple like a dually and your setup. Something small that i am not driving a Transport around. Costs add up quick especially because i live an hour away from the closest big farm country (southern Ontario).

Re: Different Windmill Raising/ Tear Down Techniques

Posted: Fri Jan 25, 2019 8:12 am
by Joshschneids
Wayne wrote: Wed Jan 23, 2019 10:18 am Eclpise 9-29-13 033.jpgRaisng my 10 FT Eclipse. Using a hinge frame I had seen at Spearmen :D
Gorgeous mill Wayne, I cringe seeing that half way up just imagining it falling. I would never forgive myself. I would love to have a wood mill of my own. Josh

Re: Different Windmill Raising/ Tear Down Techniques

Posted: Fri Jan 25, 2019 8:01 pm
by Ron Stauffer
I hope I didnt malign hinging too badly. It certainly can be done but if something fails it is not forgiving.

Pump hoists are the nicest for down the well work. Cranes are nicest for stabbing heads on towers. A pump hoist boom does not rotate so they only way to go sideways is to lean the rig. The outriggers on a pump hoist are only about 5' apart so you can imagine how safe it is to lean the truck. The boon on a pump hoist will only layback about 10' on a standard length boom. To set a head on an already standing tower with a pump hoist requires that you lean the truck and layback to be able to pick it up to clear the tower. The only other option is picking up the head before backing in to the tower. Moving with the boom up and with weight on the line is equally thrilling. This is where a crane is much nicer for stabbing a head on an already standing tower. A smaller crane that sets trusses is ideal. These operators are used to more precise maneuvering and will do it the most reasonable because they are not as expensive of a rig.

Ron Stauffer
Montrose CO

Re: Different Windmill Raising/ Tear Down Techniques

Posted: Sat Jan 26, 2019 10:28 am
by Wayne
Josh, When they are going up that way. There is much butt puckering going on! You can see lots of stuff going wrong at that time. Bought me a host mounted it on an old trailer. Have taken mills down with it but have not raised one yet. Maybe soon.

Re: Different Windmill Raising/ Tear Down Techniques

Posted: Sun Jan 27, 2019 8:24 am
by grezmonki
Skyhook was a popular brand of small crane for sign installation Thru the 90"s. They're no longer made so a guy can buy one now relatively cheap( but if a parts breaks on it, hard to find and not cheap)! A friend of mine uses this one, it works very smooth.
IMG_20170104_214641_216.jpg

Re: Different Windmill Raising/ Tear Down Techniques

Posted: Sun Jan 27, 2019 9:00 am
by windybob
One on the left looks much like mine.

Re: Different Windmill Raising/ Tear Down Techniques

Posted: Sun Jan 27, 2019 3:29 pm
by Mister Ed
windybob wrote: Sun Jan 27, 2019 9:00 am One on the left looks much like mine.
I wonder if its dashboard wires are all taped up too? :o :o :o :o

Gosh, its nice we are all back. :lol: :lol: :lol: :lol:

Re: Different Windmill Raising/ Tear Down Techniques

Posted: Sun Jan 27, 2019 6:41 pm
by windybob
When you get the whole stinkin' wire harness, you don't need tape. Haha