Drawings to put together monitor 8ft hambone

Posted: Thu Apr 18, 2024 11:06 am
by Guy Barth
I am looking for help to out back together a monitor 8ft hambone mill. I am good with the tower but am having a hard time figuring out the brake system. So was wondering if there are any installation drawing available

Re: Drawings to put together monitor 8ft hambone

Posted: Thu Apr 18, 2024 11:07 am
by Guy Barth
Guy

Re: Drawings to put together monitor 8ft hambone

Posted: Thu Apr 18, 2024 7:52 pm
by windybob
If I have time tomorrow, I will get you some pics from the shop. I can throw a few parts together.

Re: Drawings to put together monitor 8ft hambone

Posted: Sat Apr 20, 2024 10:46 am
by windybob
here are some pics from a 6 footer. Should be the same for an 8 footer. Holler back with questions.

IMG_0024 ED 2.jpg
IMG_0023 ED.jpg
IMG_0022.jpg
IMG_0021.jpg

Re: Drawings to put together monitor 8ft hambone

Posted: Thu Apr 25, 2024 9:33 am
by Guy Barth
There are two pulleys on the hambone. What are they for and how does it attach?

Re: Drawings to put together monitor 8ft hambone

Posted: Thu Apr 25, 2024 10:18 am
by mtblah
Windy , clean floor !!!

Re: Drawings to put together monitor 8ft hambone

Posted: Thu Apr 25, 2024 10:38 am
by PaulV
The pulleys are used to guide the furling chain. The furling system closes the mill and actuates the brake. It is actuated by a wire or cable attached to the pullout handle mounted at the base of the tower.

Re: Drawings to put together monitor 8ft hambone

Posted: Thu Apr 25, 2024 10:42 am
by PaulV
Additional photos of most of the case external components. This is a 6ft hambone.

Re: Drawings to put together monitor 8ft hambone

Posted: Thu Apr 25, 2024 10:58 am
by windybob
Thanks Paul. Notice my initials on the back of all the 6 footers. LOL

Re: Drawings to put together monitor 8ft hambone

Posted: Thu Apr 25, 2024 12:11 pm
by PaulV
windybob wrote: Thu Apr 25, 2024 10:58 am Thanks Paul. Notice my initials on the back of all the 6 footers. LOL
:lol: