The wheel had been chained to the tower, which damaged the wheel and tower angle at the top. However, that seemingly mitigated wear that might have occurred to the gear head. Most everything was double nutted on the gear head. The hub/head spins freely. It is damn heavy like others have mentioned in prior threads involving the Butler double gear.
The tower is 30’ overall with a 20’ top section and a 10’ bottom section. I’ll shorten it to 20’ by removing the bottom 10’ section. A pull out winch, which I presume is Butler, is attached to the tower.
I’ve removed the wheel, wheel arms and tail and then straighten them out as well as attended to the bullet holes in the sheet metal. I have a few others ahead of it in the rebuild line, so I’m letting it soak with penetrating oil. It will need a new mast pipe as its current one has some years on it, plus need 5 blades and some other things TBD.
Mike Hage’s various threads on his rebuilding efforts on his Butler double gear are very informative and should help in my rebuild efforts.
I’ve attached some photos, but as usual they load out of order selected or I can’t figure it out.


If anyone has any literature, outside of the windmill bible, I’d be interested. Thank you.