Different Windmill Raising/ Tear Down Techniques
Re: Different Windmill Raising/ Tear Down Techniques
I have a skyhook too, 65 foot. The ladder has helped a lot not only taking down and putting up mills but, helping me trim down trees.
You do not have the required permissions to view the files attached to this post.
Re: Different Windmill Raising/ Tear Down Techniques
My whole attitude about Windy changed when Windy told the story of putting in the wiring harness. I don't care what anybody says I know the man is a genius!
Re: Different Windmill Raising/ Tear Down Techniques
Wayne wrote: Sat Feb 02, 2019 9:02 am My whole attitude about Windy changed when Windy told the story of putting in the wiring harness. I don't care what anybody says I know the man is a genius!
Thanks,
Ed
Ed
Re: Different Windmill Raising/ Tear Down Techniques
Great ideas guys. When I was in Las Cruces in '05 at the Aermotor sponsored training session, they used the hinge method using a thick wall pipe for pivot and crane truck. Worked very well. I personally have an older bucket truck with 34' reach which has served me well over the years. Paul, did you make the hinges or purchase ready made? They look kind of like heavy gate hinges.
You do not have the required permissions to view the files attached to this post.
Re: Different Windmill Raising/ Tear Down Techniques
Hinges are a good idea. We have never used them, and have erected a 50 ft tower with an 8 ft Dempster head and wheel. My Boom only goes up 50 ft max, so I've heard. Total weight was too heavy to lift all at once, so we used the "split- tower" method. However, I did manage to bow the rod in the boom cylinder. Had the 1 1/4 shaft replaced with a 2 inch. I even had the truck backed up touching the tower bottom.
Usually we erect the entire outfit, but do have exceptions.
Thanks for the compliment Wayne. However, If i were a "genius" I would have already made enough money to retire on.
Usually we erect the entire outfit, but do have exceptions.
Thanks for the compliment Wayne. However, If i were a "genius" I would have already made enough money to retire on.
Call Dan Benjamin for parts. P M me for the phone number. IF YOU TALK TO HIM, AND HE HELPS YOU, THEN BUY FROM HIM. IT CREATES GOOD KARMA.
- PaulV
- Site Admin
- Posts: 1153
- Joined: Wed Dec 12, 2018 10:52 pm
- Location: Collinsville, Oklahoma
- Contact:
Re: Different Windmill Raising/ Tear Down Techniques
I made the hinges. They are a copy of the hinges that a member on the old forum came up with. I don't remember who it was though.tom b wrote: Sat Feb 02, 2019 9:40 am Paul, did you make the hinges or purchase ready made? They look kind of like heavy gate hinges.
PaulV
Re: Different Windmill Raising/ Tear Down Techniques
windybob wrote: Sat Feb 02, 2019 7:43 pm Hinges are a good idea. We have never used them, and have erected a 50 ft tower with an 8 ft Dempster head and wheel. My Boom only goes up 50 ft max, so I've heard. Total weight was too heavy to lift all at once, so we used the "split- tower" method. However, I did manage to bow the rod in the boom cylinder. Had the 1 1/4 shaft replaced with a 2 inch. I even had the truck backed up touching the tower bottom.
Usually we erect the entire outfit, but do have exceptions.
Thanks for the compliment Wayne. However, If i were a "genius" I would have already made enough money to retire on.
Re: Different Windmill Raising/ Tear Down Techniques
It was Ivan. I made a copy and have it safely put away somewhere as soon as I can find it I'll post them.
Re: Different Windmill Raising/ Tear Down Techniques
Windy you may be like me. I tell people I have more money than I need, but not more than I want. I must have more than I need because I have a hard time passing up unneeded rusty objects.
Re: Different Windmill Raising/ Tear Down Techniques
All I ever wanted was 1 dollar more than I need to spend.
Call Dan Benjamin for parts. P M me for the phone number. IF YOU TALK TO HIM, AND HE HELPS YOU, THEN BUY FROM HIM. IT CREATES GOOD KARMA.