Erecting the tower and motor

Posted: Sun Oct 04, 2020 7:22 am
by Steve in Va
Good morning. This is my first post so I hope this is the appropriate forum. I am completing the tower and 8 ft aermotor. In a few weeks I have a crane on-site for a separate project. Apparently the crane operator has some experience doing this.
Anyway, I would appreciate any advice or experience related to rigging for lift. My plan is to hoist the lower legs off the ground using my JD so I don't twist the legs. The crane will rig and lift vertical. So, to avoid damaging any portion of the mechanism or tail vane, what's the best rigging?
TIA.

Re: Erecting the tower and motor

Posted: Sun Oct 04, 2020 11:42 am
by Bryon
Long strap just under the mast pipe base. 90 degrees from the furling mechanism.
P9170004.JPG
This also takes a lot of weight off the legs of the tower. You still need to lift the bottom of the tower (two people) until the head/mill is hanging in the air by the crane.

Re: Erecting the tower and motor

Posted: Sun Oct 04, 2020 12:52 pm
by Steve in Va
That is EXACTLY what I was looking for. Thanks very much.

Re: Erecting the tower and motor

Posted: Sun Oct 04, 2020 5:50 pm
by windybob
Anything to do with windmills, this is the right place Steve.